High-strength and Quick-installation Steel Frame Bridges for Professional Steel Structure Building Supplies in China
PRODUCT DISPLAY
Steel structure bridge
High-strength and Quick-installation Steel Frame Bridges for Professional Steel Structure Building Supplies in China
Product Description
| Model NO. | Customized | Certificate | IS09001,CE |
| Life | 50years | Across Way | Fixed Bridge |
| Lane Position | Deck Bridge | Usage | Over Water bridge,Tractor bridge,Pontoon,Footbridge,Public Iron Dual Purpose Bridge,Highway Bridge |
| Brand | Shunxin | Stress Characteristics | Arch Bridge |
| Material | Steel Bridge | Main Frame | H Beam and Column,Lower Chord Brace |
| Secondary Frame | Tie Bar,Bracing,Diagonal Rod for Bridge | Steel code | Q235-B,0345-B,Stainlesssteel |
| Specification | L*WH | Surface Treatment | Shot Blasting.Galvanized orPainted |
| Floor | Floor Deck Model 720 | Lead Time | 45-60 Days |
| Cutting | Plasma Cutting,CNC Cutting | Shot Blasting Standard | SA2.0-2.5 |
| Pre-Assembly | Pre-Asembly in Our Factory | Welding | Continuous Weld FullLenath |
| Origin | Qingdao China | Transport Package | Steel Pllet+Container |
--Economic priorities
Efficient use of resources
Minimum disruption
Durability
Adaptability
--Environmental priorities
Recycling and re-use
Minimum CO2 energy burdens
Minimum waste
Lightweight construction
--Social priorities
Sustainable communities
Health and safety
Minimum impact
Aesthetically pleasing bridges
![]()
* Cable-stayed bridges. * Sky bridges
* Comprehensive girder fabrication * Lift spans
* Complex heavy steel bridge fabrication * Steel structure pedestrian bridges
* Plate girders * Cantilever bridges
* Wide flange girders * Platform & foot-over bridges
* Truss bridges * Steel composite girders
* Arch bridges * Road over bridges (ROB)
* Trapezoidal tub girders * Open web girders
* Bascule bridges * Foot over bridges
* Lift spans * Platform bridges
![]()
Advantage
![]()
![]()
![]()
![]()
![]()
Inquiry Now